CEM Practice Questions (2026) — Free Sample Questions with Answers

16 free CEM questions from our 150-question bank, grouped by content domain. Each answer explains why the right option is right — and why every wrong option is wrong.

0 of 16 answered — answer a question to check it Take a full CEM practice test

Energy and Sustainability Policies, Codes and Standards

Question 1

A college campus used 4,200,000 kWh of purchased electricity and burned 60,000 therms of natural gas in its own boilers last year. Emission factors: electricity 0.85 lb CO₂e/kWh; natural gas 11.7 lb CO₂e/therm. What were the campus's Scope 2 emissions? (1 metric ton = 2,204.6 lb)

Show answer & explanation

Answer: B

  1. Givens: purchased electricity 4,200,000 kWh at 0.85 lb CO₂e/kWh; on-site gas 60,000 therms at 11.7 lb CO₂e/therm.
  2. Classify: purchased electricity = Scope 2 (indirect); gas burned in owned boilers = Scope 1 (direct), so it is excluded.
  3. Scope 2 = 4,200,000 kWh × 0.85 lb/kWh = 3,570,000 lb CO₂e.
  4. Convert: 3,570,000 lb ÷ 2,204.6 lb/metric ton = 1,619 metric tons CO₂e.

318 metric tons CO₂e: This is the natural gas combustion total, which is Scope 1 (direct emissions from owned boilers), not Scope 2.

1,619 metric tons CO₂e: Correct. Scope 2 covers indirect emissions from purchased electricity: 4,200,000 × 0.85 = 3,570,000 lb ÷ 2,204.6 = 1,619 metric tons.

1,785 metric tons CO₂e: Divided by 2,000 lb (short tons) instead of 2,204.6 lb per metric ton.

1,938 metric tons CO₂e: Added the Scope 1 natural gas emissions to the purchased-electricity emissions.

GHG Protocol scopes: Scope 1 is direct combustion on owned equipment, Scope 2 is purchased electricity, steam or chilled water, Scope 3 is other value-chain emissions; emissions = activity × emission factor.

Energy Rates, Tariffs and Supply Options

Question 2

A facility set its annual peak of 1,200 kW in July. Its tariff bills demand at the greater of the month's actual demand or 80% of the highest demand in the preceding 11 months, at $12.00/kW-month. Using the demands below, how much more did the facility pay for demand from October through March because of the ratchet?

Actual monthly peak demand
MonthActual demand (kW)
October900
November820
December760
January700
February740
March980
The July peak of 1,200 kW is the highest demand in the preceding 11 months for every month shown.
Show answer & explanation

Answer: C

  1. Givens: annual peak 1,200 kW; ratchet 80%; demand charge $12.00/kW-month.
  2. Ratchet floor = 0.80 × 1,200 kW = 960 kW. Billing demand = max(actual, 960).
  3. Excess over actual: Oct 60, Nov 140, Dec 200, Jan 260, Feb 220, Mar 0 (980 > 960) → total 880 kW-months.
  4. Added cost = 880 kW-months × $12.00 = $10,560.

$3,120: Calculated the ratchet penalty for January only.

$10,320: Counted March (980 kW, above the 960 kW ratchet) as a negative 20 kW instead of zero penalty.

$10,560: Correct. Ratchet demand = 0.80 × 1,200 = 960 kW; excess billed kW = 60 + 140 + 200 + 260 + 220 + 0 = 880 kW × $12 = $10,560.

$27,600: Applied a 100% ratchet (1,200 kW) instead of 80%.

$69,360: Reported the total demand charges billed for the six months, not the extra cost caused by the ratchet.

A demand ratchet sets a floor on billing demand for up to 11 months after a peak, so one summer peak can raise demand charges all winter; peak control pays off year-round.

Energy Audits and Instrumentation

Question 3

A 48,000 ft² police headquarters used 620,000 kWh of electricity and 18,500 therms of natural gas last year. What is its site energy use index (EUI)?

Show answer & explanation

Answer: C

  1. Givens: 620,000 kWh; 18,500 therms; 48,000 ft²; 1 kWh = 3,412 Btu; 1 therm = 100,000 Btu
  2. Electricity: 620,000 × 3,412 = 2,115,440,000 Btu
  3. Gas: 18,500 × 100,000 = 1,850,000,000 Btu
  4. Total: 3,965,440,000 Btu/yr
  5. EUI = 3,965,440,000 ÷ 48,000 = 82,613 Btu/ft²-yr ≈ 82.6 kBtu/ft²-yr

38.5 kBtu/ft²-yr: Counted only the natural gas.

44.1 kBtu/ft²-yr: Counted only the electricity.

82.6 kBtu/ft²-yr: Correct. Site EUI = (620,000 × 3,412 + 18,500 × 100,000) Btu ÷ 48,000 ft² = 3,965,440,000 ÷ 48,000 ≈ 82,600 Btu/ft²-yr = 82.6 kBtu/ft²-yr.

167.7 kBtu/ft²-yr: Converted kWh at a 10,000 Btu/kWh power-plant heat rate instead of the site value of 3,412 Btu/kWh.

429.5 kBtu/ft²-yr: Treated therms as dekatherms (1,000,000 Btu each) instead of 100,000 Btu.

Site EUI converts every fuel to Btu at site values (3,412 Btu/kWh, 100,000 Btu/therm), sums them and divides by floor area.

Question 4

An auditor checks an inverted-bucket steam trap. An infrared thermometer shows the inlet and outlet piping at nearly the same temperature, which is expected because condensate flashes downstream. Which instrument will best show whether the trap is cycling normally or blowing live steam?

Show answer & explanation

Answer: E

Sling psychrometer: A psychrometer measures air dry-bulb and wet-bulb temperatures for humidity, not trap performance.

Infrared thermometer: The stem already shows that surface temperatures cannot separate flash steam from blow-through on this trap.

Combustion analyzer: A combustion analyzer measures flue gases at the boiler, not trap operation.

Pitot tube and manometer: A pitot tube measures air velocity pressure in ducts, not steam flow through a trap.

Ultrasonic tester: Correct. An ultrasonic tester lets the auditor hear the trap's operating sound: a normal bucket trap cycles open and shut, while a failed trap gives a continuous rushing sound of blow-through.

When temperature readings are ambiguous, use ultrasonic testing to tell a cycling steam trap from one that is blowing through.

Energy Accounting and Economics

Question 5

A ground-source heat pump retrofit costs $200,000 and saves $28,000 per year in energy, but adds $3,000 per year in maintenance. Life is 15 years, with no salvage, and the discount rate is 6%. P/A (6%, 15) = 9.7122. What is the savings-to-investment ratio (SIR)?

Show answer & explanation

Answer: A

  1. Givens: investment $200,000; energy savings $28,000/yr; added maintenance $3,000/yr; n = 15; i = 6%; P/A = 9.7122
  2. Net annual savings = 28,000 − 3,000 = $25,000
  3. PW of net savings = 25,000 × 9.7122 = $242,806
  4. SIR = 242,806 ÷ 200,000 = 1.21 (> 1.0, so cost-effective)

1.21: Correct. SIR = PW of net savings ÷ investment = (28,000 − 3,000) × 9.7122 ÷ 200,000 = 242,806 ÷ 200,000 ≈ 1.21.

1.36: Ignored the added maintenance cost (28,000 × 9.7122 ÷ 200,000).

1.88: Ignored discounting ((25,000 × 15) ÷ 200,000).

2.10: Ignored both the maintenance cost and discounting ((28,000 × 15) ÷ 200,000).

SIR = present worth of savings net of operating and maintenance cost changes ÷ present worth of investment; SIR > 1 is cost-effective.

Electrical Power Systems and Motors

Question 6

A plant is replacing a working 75 hp process pump motor with a premium-efficiency motor (see table). The motor runs during the monthly peak in all 12 months. What are the annual cost savings?

Motor replacement data
ItemValue
Rated output75 hp
Load factor0.80
Runtime5,200 h/yr
Existing motor efficiency91.0%
Premium motor efficiency95.0%
Demand charge$13/kW-month
Energy charge$0.072/kWh
Show answer & explanation

Answer: D

  1. Shaft load: 75 hp × 0.746 kW/hp × 0.80 = 44.76 kW.
  2. ΔkW = 44.76 × (1/0.910 − 1/0.950) = 44.76 × (1.0989 − 1.0526) = 44.76 × 0.04627 = 2.071 kW.
  3. Energy savings: 2.071 kW × 5,200 h = 10,769 kWh × $0.072 = $775.
  4. Demand savings: 2.071 kW × $13/kW-month × 12 = $323.
  5. Total ≈ $775 + $323 = $1,098 per year.

$775: Counted only the energy savings and omitted 12 months of demand charges.

$802: Applied the demand charge for one month instead of 12.

$950: Multiplied by efficiency instead of dividing (kW = hp × 0.746 × LF × η).

$1,098: Correct. ΔkW = 75 × 0.746 × 0.80 × (1/0.91 − 1/0.95) = 2.07 kW; savings = 2.07 × 5,200 × $0.072 + 2.07 × 12 × $13 ≈ $775 + $323 = $1,098.

$1,373: Ignored the 0.80 load factor and assumed full load.

Motor input kW = hp × 0.746 × LF ÷ η, so savings use the difference of reciprocal efficiencies; include both energy and 12 months of coincident demand.

Lighting Systems

Question 7

A 60 ft × 40 ft laboratory is to be designed for 45 maintained footcandles. Each LED luminaire produces 6,000 initial lumens. From the zonal cavity calculation, the coefficient of utilization is 0.65, and the total light loss factor is 0.85. How many luminaires are needed?

Show answer & explanation

Answer: D

  1. Givens: E = 45 fc; A = 60 × 40 = 2,400 ft²; 6,000 lm per luminaire; CU = 0.65; LLF = 0.85.
  2. Lumen method: N = (E × A) ÷ (lumens per luminaire × CU × LLF).
  3. N = (45 × 2,400) ÷ (6,000 × 0.65 × 0.85) = 108,000 ÷ 3,315 = 32.6.
  4. Round up to 33 luminaires to meet the maintained target.

10: Multiplied by CU and LLF instead of dividing by them.

22: Omitted the coefficient of utilization, assuming all lamp lumens reach the work plane.

28: Omitted the light loss factor, giving initial rather than maintained footcandles.

33: Correct. N = E × A ÷ (lumens × CU × LLF) = 45 × 2,400 ÷ (6,000 × 0.65 × 0.85) = 32.6, rounded up to 33.

The lumen method divides the required work-plane lumens (fc × ft²) by the useful maintained lumens per luminaire (initial lumens × CU × LLF).

HVAC Systems and Building Envelope

Question 8

A bus maintenance garage has 12,000 ft² of exterior wall. Insulated panels will lower its U-factor from 0.25 to 0.08 Btu/h·ft²·°F.

Heating degree days (65°F base): 6,200 Gas furnace efficiency: 78% Gas price: $1.05/therm

What are the annual heating cost savings?

Show answer & explanation

Answer: D

  1. Given: A = 12,000 ft²; ΔU = 0.25 − 0.08 = 0.17 Btu/h·ft²·°F; 6,200 HDD; η = 0.78; $1.05/therm.
  2. ΔQ = ΔU × A × HDD × 24 = 0.17 × 12,000 × 6,200 × 24 = 303,552,000 Btu/yr.
  3. Fuel saved = 303,552,000 ÷ 0.78 = 389,169,000 Btu = 3,892 therms.
  4. Savings = 3,892 × $1.05 = $4,086/yr.

$170: Omitted the 24 h/day that converts degree-days to degree-hours.

$2,486: Multiplied by the furnace efficiency instead of dividing.

$3,187: Left out the furnace efficiency.

$4,086: Correct. ΔQ = 0.17 × 12,000 × 6,200 × 24 = 303.6 × 10⁶ Btu; ÷ 0.78 = 389.2 × 10⁶ Btu = 3,892 therms × $1.05 = $4,086.

$6,009: Used the existing U-factor (0.25), which is the current wall loss, not the savings.

Seasonal conduction Q = U·A·DD·24; use the change in U for savings and divide by heating-system efficiency to get fuel.

Question 9

A single-effect absorption chiller at a paper mill produces 250 tons of cooling with a COP of 0.68 (cooling output ÷ generator heat input). Ignoring pump work, how much heat must its cooling tower reject?

Show answer & explanation

Answer: E

  1. Given: 250 tons; COP = 0.68; pump work ignored.
  2. Evaporator load = 250 × 12,000 = 3,000,000 Btu/h.
  3. Generator input = 3,000,000 ÷ 0.68 = 4,411,765 Btu/h.
  4. Energy balance: heat rejected = 3.00 + 4.41 = 7.41 MMBtu/h.

1.41 MMBtu/h: Subtracted the cooling output from the generator input; both heat streams leave through the tower.

3.00 MMBtu/h: This is only the evaporator (cooling) load; it omits the generator heat input.

4.41 MMBtu/h: This is only the generator heat input; it omits the heat absorbed in the evaporator.

5.04 MMBtu/h: Multiplied the cooling load by COP instead of dividing to get the generator input.

7.41 MMBtu/h: Correct. Heat rejected = evaporator load + generator input = 3.00 + 3.00/0.68 = 3.00 + 4.41 = 7.41 MMBtu/h.

For an absorption chiller, heat rejected ≈ cooling load + generator heat; with a COP well below 1, its tower must be much larger than an electric chiller’s.

Building Automation, Controls and Artificial Intelligence Systems

Question 10

A branch library will set its heating set point back from 70°F to 60°F for 10 hours each night over a 150-night heating season. Assume the space falls to 60°F immediately, outdoor air stays below 60°F during setback, and recovery energy is negligible. What is the annual gas cost savings?

Building and plant data
ItemValue
Building heat-loss coefficient (UA)8,000 Btu/h·°F
Boiler efficiency80%
Natural gas price$1.20/therm
Show answer & explanation

Answer: C

  1. Givens: UA = 8,000 Btu/h·°F; ΔT reduction = 70 − 60 = 10°F; 10 h/night × 150 nights = 1,500 h; η = 0.80; $1.20/therm.
  2. Heat loss avoided = UA × ΔT × h = 8,000 × 10 × 1,500 = 120,000,000 Btu/yr.
  3. Fuel saved = 120,000,000 Btu ÷ 0.80 = 150,000,000 Btu = 1,500 therms (1 therm = 100,000 Btu).
  4. Cost saved = 1,500 therms × $1.20 = $1,800/yr.

$180: Leaves out the 10 hours per night, treating Btu/h as Btu per night.

$1,440: Ignores boiler efficiency; the reduced heat load must be divided by 0.80 to get the fuel saved.

$1,800: Correct. Heat saved = UA × ΔT × hours = 8,000 × 10 × 10 × 150 = 120,000,000 Btu; fuel = 120,000,000 ÷ 0.80 = 1,500 therms × $1.20 = $1,800.

$4,320: Applies the 10°F setback for 24 hours a day instead of the 10 setback hours each night.

Setback savings equal UA × the temperature reduction × setback hours, divided by heating-plant efficiency to convert the avoided load to fuel.

Energy Storage Systems

Question 11

A university adds a chilled-water storage tank. On design days the chillers are shut off for the entire 12:00–6:00 p.m. on-peak period, and the tank alone meets the campus cooling load. This strategy is called:

Show answer & explanation

Answer: A

Full storage: Correct. Full (load-shifting) storage moves the entire on-peak cooling load to off-peak chiller operation, so no chiller runs during the peak window.

Partial storage, load leveling: Load leveling runs the chiller at a constant output all day, with the tank covering only the load above that output.

Partial storage, demand limiting: Demand limiting keeps the chiller running on peak at a reduced, capped output; here the chillers are off.

Chiller-priority operation: Chiller priority meets load with the chiller first and uses storage only for the excess, the opposite of this case.

Full storage shifts all on-peak cooling to off-peak; partial storage (load leveling or demand limiting) keeps a chiller running on peak and needs a smaller tank.

Boiler and Steam Systems

Question 12

High-pressure condensate (8,000 lb/h, saturated at 150 psig) drains to a 10 psig flash tank that supplies a low-pressure heating header. Saturated water at 150 psig: hf = 338 Btu/lb, hfg = 857 Btu/lb. At 10 psig: hf = 208 Btu/lb, hfg = 952 Btu/lb. About how much flash steam is produced?

Show answer & explanation

Answer: B

  1. Givens: 8,000 lb/h; hf(150 psig) = 338 Btu/lb; hf(10 psig) = 208 Btu/lb; hfg(10 psig) = 952 Btu/lb.
  2. Flash fraction = (hf,high − hf,low) / hfg,low = (338 − 208) / 952 = 0.1366.
  3. Flash steam = 8,000 × 0.1366 = 1,092 lb/h.

897 lb/h: Divided by hg at 10 psig (208 + 952 = 1,160) instead of hfg; the flashed water only needs its latent heat.

1,092 lb/h: Correct. Flash fraction = (338 − 208)/952 = 13.7%; 8,000 × 0.137 = 1,092 lb/h.

1,214 lb/h: Used hfg at the high pressure (857); evaporation happens at the flash-tank pressure, so use hfg at 10 psig.

2,840 lb/h: Divided the full high-pressure hf (338) by hfg; only the enthalpy drop (338 − 208) is available to flash water.

5,000 lb/h: Divided the enthalpy drop by hf at 10 psig instead of hfg at 10 psig.

Percent flash = (hf at the upstream pressure − hf at the flash pressure) ÷ hfg at the flash pressure.

Distributed Generation & Renewable Energy Systems

Question 13

A food processor is screening an engine-driven CHP unit (data below). Recovered heat displaces gas in an existing boiler. Below what natural gas price would CHP electricity cost less than the grid electricity it replaces?

CHP screening data
ItemValue
CHP net heat rate (HHV)11,000 Btu/kWh
Useful heat recovered5,000 Btu per kWh generated
Existing boiler efficiency80%
CHP O&M cost$0.020/kWh
Avoided grid electricity price$0.110/kWh
Show answer & explanation

Answer: D

  1. Givens: heat rate 11,000 Btu/kWh; recovered heat 5,000 Btu/kWh; boiler η = 0.80; O&M $0.020/kWh; grid $0.110/kWh.
  2. Boiler gas displaced = 5,000 ÷ 0.80 = 6,250 Btu per kWh generated.
  3. Net CHP fuel = 11,000 − 6,250 = 4,750 Btu/kWh = 0.00475 MMBtu/kWh.
  4. Break-even: 0.00475 × P + 0.020 = 0.110 → P = 0.090 ÷ 0.00475 = $18.95/MMBtu.

$8.18/MMBtu: Left out the boiler-fuel credit: 0.090 ÷ 0.011 MMBtu/kWh; recovered heat displaces boiler gas and lowers the net fuel per kWh.

$10.00/MMBtu: Left out both the heat credit and the O&M cost: 0.110 ÷ 0.011 MMBtu/kWh.

$15.00/MMBtu: Credited the 5,000 Btu of recovered heat as 5,000 Btu of gas; at 80% boiler efficiency it displaces 6,250 Btu of gas.

$18.95/MMBtu: Correct. Net fuel = 11,000 − 5,000/0.80 = 4,750 Btu/kWh; break-even when 0.00475 × P + 0.020 = 0.110, so P = 0.090 ÷ 0.00475 = $18.95/MMBtu.

A CHP screen charges the unit its full fuel, credits the boiler fuel its recovered heat displaces (heat ÷ boiler efficiency) and adds O&M; CHP pays while that net cost per kWh is below the avoided grid price.

Industrial Systems

Question 14

A dust-collector fan at a woodworking plant moves 40,000 cfm against 6.0 in. w.g. total pressure. Fan efficiency is 70% and motor efficiency is 93%. Use bhp = cfm × TP ÷ (6,356 × fan efficiency). What is the motor's electrical input?

Show answer & explanation

Answer: D

  1. Givens: 40,000 cfm; TP = 6.0 in. w.g.; fan η = 0.70; motor η = 0.93; 1 hp = 0.746 kW.
  2. bhp = 40,000 × 6.0 / (6,356 × 0.70) = 240,000 / 4,449 = 53.9 hp.
  3. Shaft kW = 53.9 × 0.746 = 40.2 kW.
  4. Electrical input = 40.2 / 0.93 = 43.3 kW.

28.2 kW: Used air horsepower (no fan efficiency) and left out motor efficiency.

37.4 kW: Multiplied by motor efficiency instead of dividing by it.

40.2 kW: Converted brake horsepower to kW but left out the 93% motor efficiency.

43.3 kW: Correct. bhp = 40,000 × 6.0 ÷ (6,356 × 0.70) = 53.9 hp; input = 53.9 × 0.746 ÷ 0.93 = 43.3 kW.

53.9 kW: Reported brake horsepower as kW without converting (× 0.746) or dividing by motor efficiency.

Fan input kW = cfm × TP ÷ (6,356 × η_fan) × 0.746 ÷ η_motor; divide by each efficiency in the chain.

Operations, Maintenance and Commissioning

Question 15

Fireside soot has raised a laundry plant's net boiler stack temperature from 360°F (clean baseline) to 460°F. With clean tubes, the boiler burned 24,000 MMBtu/yr of gas at $7.50/MMBtu and is rated 82% efficient. Use the rule of thumb that fuel use rises about 1% for each 40°F rise in net stack temperature. What will cleaning the tubes save per year?

Show answer & explanation

Answer: B

  1. Givens: stack 360°F → 460°F; fuel 24,000 MMBtu/yr; $7.50/MMBtu; rule 1% fuel per 40°F.
  2. Stack-temperature rise = 460 − 360 = 100°F.
  3. Fuel penalty = 100 ÷ 40 × 1% = 2.5%.
  4. Fuel saved = 24,000 × 0.025 = 600 MMBtu/yr.
  5. Cost saved = 600 × $7.50 = $4,500/yr.

$3,690: Applied the 2.5% to the boiler's useful output (24,000 × 0.82) instead of to the fuel burned.

$4,500: Correct. Rise = 460 − 360 = 100°F → 100/40 × 1% = 2.5%; 24,000 MMBtu × 0.025 = 600 MMBtu × $7.50 = $4,500.

$5,488: Divided the fuel savings by the 82% efficiency; the rule already applies to fuel input, so efficiency is not applied again.

$20,700: Divided the full 460°F stack temperature by 40 (11.5%) instead of the 100°F rise above the clean baseline.

A rising net stack temperature at the same firing rate signals fouling; estimate the penalty from the rise above the clean baseline (about 1% per 40°F) and apply it to fuel input.

Energy Savings Performance Contracting and Measurement & Verification

Question 16

An ESCO installs VFDs on six air-handler supply fans. Fan load varies hourly and operating hours change with occupancy, so neither can be reasonably stipulated. The fans can be submetered, and expected savings are about 4% of the building's total electricity use. Which IPMVP option is most appropriate?

Show answer & explanation

Answer: C

Option A, key parameter measurement: Option A measures only the key parameter and stipulates the rest; here neither fan power nor hours can be reasonably stipulated.

Option D, calibrated simulation: Option D suits cases with no baseline data or many interacting measures; direct submetering of the fans is simpler and more accurate.

Option B, all parameter measurement: Correct. Option B isolates the retrofit and continuously measures all parameters (fan kW over time), which suits loads and hours that both vary.

Option C, whole facility: Savings of about 4% are too small to separate reliably from normal variation in the whole-building meter; Option C generally needs larger savings.

IPMVP: A = retrofit isolation with key-parameter measurement; B = retrofit isolation measuring all parameters; C = whole-facility meter (savings large relative to use); D = calibrated simulation.

Test yourself under exam conditions

Take the free CEM test and get a score report by domain.

The full CEM question bank is coming. Get an email when it launches.