10 free CEM practice questions in the real exam format, covering the official content areas, with an explanation for every answer.
CEM Practice Test 12Tutor mode
Question 1 of 10
Boiler and Steam Systems
A chemical plant installs a flash tank and heat exchanger on its continuous surface blowdown. Using the data shown, what is the annual fuel cost savings?
Blowdown data
Item
Value
Blowdown flow
1,200 lb/h, saturated water at 150 psig (hf = 338 Btu/lb)