LEED GA Practice Questions (2026) — Free Sample Questions with Answers

17 free LEED GA questions from our 150-question bank, grouped by content domain. Each answer explains why the right option is right — and why every wrong option is wrong.

0 of 17 answered — answer a question to check it Take a full LEED GA practice test

LEED Process

Question 1

A LEED v5 BD+C project attempted 64 points, and all prerequisites were approved. In final review, credits worth 3 points and 4 points were denied. Which certification level does the project earn?

Show answer & explanation

Answer: B

  1. 1. Start with the points attempted: 64 points.
  2. 2. Subtract the denied credits: 64 − 3 − 4 = 57 points awarded.
  3. 3. Compare with the levels: Certified 40–49, Silver 50–59, Gold 60–79, Platinum 80+.
  4. 4. 57 points falls in 50–59, so the project is LEED Silver.

Certified: Certified covers 40–49 points; the project keeps 57 points.

Silver: Correct. 64 − 3 − 4 = 57 awarded points, which falls within the Silver range of 50–59 points.

Gold: Gold (60–79) would apply to the 64 points attempted, but the level is based on the points awarded after review.

Platinum: Platinum starts at 80 points, far above this total.

The level is set by points awarded after review: Certified 40–49, Silver 50–59, Gold 60–79, Platinum 80+.

Question 2

To improve indoor air quality, a team plans to supply outdoor air well above the minimum ventilation rate in a hot, humid climate. Which strategy BEST limits the energy penalty of this decision?

Show answer & explanation

Answer: C

Lower the filter efficiency rating: Weaker filtration reduces fan energy slightly but undermines the air-quality goal.

Install a larger cooling plant: A bigger plant meets the higher load but does nothing to reduce the energy used.

Add energy recovery ventilation: Correct. Energy recovery ventilation transfers heat and moisture between exhaust and incoming air, which cuts the cooling and dehumidification load of the extra outdoor air, so the team keeps the air-quality benefit with far less energy use.

Add operable windows throughout: In a hot, humid climate, uncontrolled outdoor air raises cooling and moisture loads.

More ventilation helps EQ but costs EA energy; energy recovery resolves the trade-off.

Question 3

A developer is building a new speculative office building. The developer controls the structure, envelope and central HVAC system, but future tenants will design and build their own interiors. Which rating system is MOST appropriate?

Show answer & explanation

Answer: D

LEED v5 BD+C: New Construction: New Construction suits projects where the owner controls the design of the whole building, including interiors.

LEED v5 ID+C: ID+C is for the later tenant fit-outs, not for the base building the developer is constructing.

LEED v5 O+M: O+M certifies an existing building in operation, not a building under construction.

LEED v5 BD+C: Core and Shell: Correct. Core and Shell is the BD+C option for projects in which the developer controls the core and shell (structure, envelope and base systems) but not the tenant interiors.

Developer controls the base building only → BD+C: Core and Shell; the tenants can later use ID+C.

Integrative Process Planning and Assessments

Question 4

A team preparing the LEED v5 Climate Resilience Assessment for a coastal office building has listed only the floods and storms recorded at the site over the past 30 years. What is the MOST important gap in this draft?

Show answer & explanation

Answer: D

It omits the building's annual energy use intensity: Energy use intensity is an energy performance metric for EA, not part of a natural hazard assessment.

It omits the code-required design wind speed: Code design loads are a code-minimum input; the assessment goes beyond code to rate site-specific hazard risk.

It omits the cost of the owner's property insurance: Insurance cost is a financial consideration, not a hazard, exposure or vulnerability rating the prerequisite calls for.

It omits projected hazards over the building's service life: Correct. The Climate Resilience Assessment prerequisite must cover current and projected future hazards (such as sea level rise and storm surge) under a stated climate scenario across the project's service life, then pick priority hazards for design; past records alone understate future risk.

Climate resilience looks forward: assess projected hazards over the building's whole service life, not just the historical record.

Location and Transportation

Question 5

An owner is comparing Site X, an undeveloped field at the edge of town with no transit service, with Site Y, a previously developed downtown lot two blocks from a bus rapid transit station. Which pair of LEED v5 credits does Site Y support MUCH more readily than Site X?

Show answer & explanation

Answer: D

Enhanced Refrigerant Management and Electric Vehicles: Both depend on equipment choices that the team controls equally at either site.

Heat Island Reduction and Rainwater Management: These SS credits depend on on-site design (roofing, paving, green infrastructure) and are achievable at either site.

Biodiverse Habitat and Light Pollution Reduction: Both are site-design credits; an undeveloped field may even offer more habitat to work with.

Sensitive Land Protection and Compact and Connected Development: Correct. Previously developed land meets Sensitive Land Protection, and the downtown location with transit access supports Compact and Connected Development; both depend on where the project is, which design cannot change later.

Location credits are won or lost at site selection; design credits can be pursued anywhere.

Question 6

A developer buys a former dry-cleaning site where state regulators have identified soil and groundwater contamination and require cleanup. The site is remediated and an apartment building is built there. Which LEED v5 BD+C credit specifically recognizes building on this remediated site?

Show answer & explanation

Answer: D

Sensitive Land Protection: The site may earn this credit as previously developed land, but the credit does not recognize remediating contamination.

Minimize Site Disturbance: This SS prerequisite limits construction disturbance and pollution; it is required of every project and does not reward brownfield sites.

Compact and Connected Development: This credit rewards density, transit access and walkability, not cleanup of contamination.

Equitable Development: Correct. Equitable Development's priority-sites option rewards locating on a brownfield where the authority with jurisdiction requires remediation, which returns contaminated land to productive use in the community.

In v5, brownfield redevelopment is recognized under Equitable Development (priority sites).

Sustainable Sites

Question 7

A coastal project's Climate Resilience Assessment ranks flooding and extreme heat as its highest-priority hazards. How should the team approach the LEED v5 Enhanced Resilient Site Design credit?

Show answer & explanation

Answer: A

Address the top hazards: flooding and heat: Correct. Enhanced Resilient Site Design aims to reduce the risk of damage from natural and climate hazards; it builds on the IP Climate Resilience Assessment by requiring best-practice site measures for the highest-priority hazards that assessment identified, here flooding and extreme heat.

Give equal design effort to every hazard in the region: The credit relies on the assessment to set priorities; spreading effort evenly ignores the hazards that matter most for this site.

Address hail first because insurers often ask about it: Hail was not identified as a priority hazard; choosing hazards for insurance reasons ignores the assessment.

Buy flood insurance rather than change the site design: Insurance moves financial risk to someone else but does nothing to make the site more resilient.

The IP Climate Resilience Assessment identifies the hazards; SS Enhanced Resilient Site Design addresses the top ones on the site.

Question 8

During the preconstruction survey for a new distribution center, the team finds a stand of plants that the state wildlife agency lists as special-status, inside the area planned for truck parking. Which response BEST meets LEED v5 Minimize Site Disturbance?

Show answer & explanation

Answer: D

Transplant the stand to a new vegetated roof: Moving special-status plants to a rooftop does not conserve them in place, and roof growing media rarely support the same plant community.

Buy and protect a similar habitat parcel off site: Off-site compensation does not meet the requirement to conserve the special-status vegetation on the project site.

Clear the stand, then replant natives after construction: Replanting generic natives later destroys the protected stand, which the prerequisite requires to be conserved.

Move the parking and fence off the stand: Correct. Minimize Site Disturbance requires conserving all on-site special-status vegetation and protecting healthy habitat with physical barriers during construction, so the layout moves around the stand and a fenced exclusion zone keeps equipment out.

Special-status vegetation found in the site assessment is conserved in place, and the design adapts around it.

Water Efficiency

Question 9

An office team calculates its daily fixture water use from the table below. By about what percent does the design reduce daily fixture water use from the baseline?

Daily fixture use (given baseline and design rates)
FixtureDaily usesBaseline rateDesign rate
Toilets250 flushes1.6 gpf (6.0 lpf)1.28 gpf (4.8 lpf)
Urinals200 flushes1.0 gpf (3.8 lpf)0.125 gpf (0.5 lpf)
Lavatory faucets100 min of flow0.5 gpm (1.9 lpm)0.35 gpm (1.3 lpm)
gpf = gallons per flush; gpm = gallons per minute.
Show answer & explanation

Answer: B

  1. 1. Baseline: toilets 250 × 1.6 = 400 gal; urinals 200 × 1.0 = 200 gal; faucets 100 × 0.5 = 50 gal; total 650 gal/day (about 2,460 L).
  2. 2. Design: toilets 250 × 1.28 = 320 gal; urinals 200 × 0.125 = 25 gal; faucets 100 × 0.35 = 35 gal; total 380 gal/day (about 1,440 L).
  3. 3. Reduction: (650 − 380) ÷ 650 = 270 ÷ 650 ≈ 0.415, about 42%.

20%: This is the toilet reduction alone (1.28 vs 1.6 gpf); it ignores the urinal and faucet savings.

42%: Correct. Baseline = 400 + 200 + 50 = 650 gal/day; design = 320 + 25 + 35 = 380 gal/day; reduction = 270 ÷ 650 ≈ 42%.

58%: This is the design use as a share of the baseline (380 ÷ 650), not the reduction.

88%: This is the urinal reduction alone (0.125 vs 1.0 gpf); urinals are only part of total use.

Total all fixtures first, then reduction = (baseline − design) ÷ baseline.

Energy and Atmosphere

Question 10

A team in a region whose grid still relies heavily on fossil fuels, but whose utility is steadily cutting the carbon intensity of its supply, is debating heat pumps versus new gas boilers. Why does an all-electric design usually lower operational emissions MORE over the building’s life?

Show answer & explanation

Answer: A

Efficient heat pumps on a grid that gets cleaner: Correct. Heat pumps deliver several units of heat per unit of electricity, and Electrification and the Operational Carbon Projection look at emissions over decades: as the utility adds renewables, the all-electric building’s emissions keep falling, while emissions from on-site gas combustion stay locked in for the life of the boilers.

Electricity has no emissions at the point of use: Point-of-use emissions are zero, but grid generation still emits, so the grid source does matter.

Gas boilers lose much more efficiency as they age: Boiler efficiency can drift with poor maintenance, but that is not the main reason; the advantage comes from heat pump efficiency combined with a decarbonizing grid.

Gas boilers have a higher ODP than heat pumps: Ozone depletion is not the reason; natural gas combustion emits CO₂, not ozone-depleting substances.

Electrify with efficient heat pumps: an all-electric building gets cleaner as the grid decarbonizes; on-site combustion does not.

Question 11

An owner buys unbundled renewable energy certificates (RECs) equal to 100% of a new building's annual electricity use. What does this purchase accomplish?

Show answer & explanation

Answer: A

It supports a renewable claim, not lower use: Correct. A REC represents the environmental attributes of 1 MWh of renewable electricity delivered to the grid; buying RECs lets the owner claim renewable electricity, but the building’s own energy use and peak demand are unchanged.

It reduces the building's metered electricity use: RECs are certificates; the meter still records the same consumption.

It generates renewable electricity on the site: Unbundled RECs come from generators elsewhere; nothing is produced on site.

It lowers the building's peak demand from the grid: Peak demand depends on the building's loads and controls, which RECs do not change.

RECs change the claim about the energy source, not the building's energy use; reduce use first.

Question 12

A design team for a new office building in a cold climate wants to shrink the heating plant before any equipment is selected. Which strategy should the team address FIRST?

Show answer & explanation

Answer: B

Specify high-efficiency condensing gas boilers: Efficiency comes after load reduction; a more efficient boiler still serves an unnecessarily large load.

Improve envelope insulation and airtightness: Correct. Reduce Peak Thermal Loads rewards cutting heating and cooling demand at its source; a better-insulated, tighter envelope lowers the load itself, so every later system can be smaller and use less energy.

Purchase RECs to cover heating energy: RECs address the energy source and claims, not the size of the heating load.

Add rooftop solar to power the heating plant: Renewable supply is the last step of the hierarchy; it does not reduce the demand it must meet.

Follow the energy hierarchy: reduce loads first, then serve them efficiently, then supply them with renewables.

Materials and Resources

Question 13

The table shows the construction waste tally for a new elementary school. What is the project's construction and demolition waste diversion rate by weight?

Construction waste tally
MaterialDestinationWeight, tons (metric tons)
ConcreteRecycled210 (190.5)
MetalsRecycled30 (27.2)
Dimensional lumberSalvaged for reuse40 (36.3)
Mixed debrisLandfill120 (108.9)
Show answer & explanation

Answer: D

  1. 1. Total waste generated = 210 + 30 + 40 + 120 = 400 tons (362.9 metric tons).
  2. 2. Diverted waste (recycled or salvaged) = 210 + 30 + 40 = 280 tons (254.0 metric tons).
  3. 3. Diversion rate = 280 / 400 = 0.70 = 70%.

30%: This is the landfilled share (120 / 400); the diversion rate is the complement.

52.5%: This counts only the concrete (210 / 400); recycled metals and salvaged lumber are also diverted.

60%: This leaves out the salvaged lumber (240 / 400); materials salvaged for reuse count as diverted.

70%: Correct. Diverted waste is 210 + 30 + 40 = 280 tons of 400 tons generated, so 280 / 400 = 70%, the metric tracked for the MR Construction and Demolition Waste Diversion credit.

Diversion rate = (recycled + salvaged weight) / total waste generated.

Question 14

A pediatric clinic's owner wants to know which chemical ingredients are in the flooring products under consideration and whether any are associated with health hazards. Which document should the team request from manufacturers?

Show answer & explanation

Answer: B

An environmental product declaration (EPD): An EPD reports LCA-based environmental impacts such as GWP; it does not list ingredients and their health hazards.

A Health Product Declaration (HPD): Correct. An HPD discloses a product's ingredients and the health hazards associated with them, which is exactly the ingredient transparency the owner wants when comparing products.

A Forest Stewardship Council (FSC) certificate: FSC certification addresses responsible forest management for wood, not chemical ingredients.

An ENERGY STAR product label: ENERGY STAR addresses energy performance of equipment and appliances, not material ingredients.

HPD = ingredients and health hazards; EPD = life-cycle environmental impacts.

Question 15

A university research building is expected to change its lab layouts every few years as grants come and go. Which design strategy would BEST reduce the material life-cycle impacts of these future changes?

Show answer & explanation

Answer: A

Demountable partitions and modular services: Correct. Designing for flexibility and disassembly lets layouts be reconfigured with the same components instead of demolishing and rebuilding, which avoids new material manufacture and waste each time the program changes, a core MR life-cycle strategy.

Fixed gypsum walls with high recycled content: Recycled content lowers the impact of the first installation, but fixed walls are still demolished and replaced at every change.

Higher-efficiency fume hood exhaust fans and motors: Efficient exhaust fans reduce operational energy (EA); they do nothing for the materials consumed by repeated renovations.

A recycling contract for future renovation debris: Recycling demolition debris ranks below avoiding the demolition in the first place; it manages waste rather than preventing it.

Design for flexibility and disassembly keeps materials in use through program changes, avoiding repeated demolition and new manufacture.

Indoor Environmental Quality

Question 16

In winter, occupants seated next to a two-story wall of older single-pane glass report feeling cold, although the air temperature measured at their desks is at the heating setpoint. What is the MOST likely cause?

Show answer & explanation

Answer: A

Low radiant temperature from cold glass: Correct. Thermal comfort depends on surface (radiant) temperatures as well as air temperature; cold glazing draws body heat by radiation and causes downdrafts, so occupants feel cold even at the air setpoint. High-performance glazing or perimeter heating addresses it.

An outdoor air ventilation rate set too low: Low ventilation causes stuffiness and CO2 buildup, not a cold sensation near windows.

High levels of VOCs from interior finishes: VOCs affect air quality and health, not the sensation of cold.

Excessive daylight glare from the glazing: Glare is a visual comfort problem, not a thermal one.

Thermal comfort design considers radiant temperature and drafts, not just air temperature.

Question 17

Occupants of a busy public library regularly track in dirt, pollen and moisture from the street. Which design measure MOST directly reduces these contaminants entering the building?

Show answer & explanation

Answer: C

Lower-VOC wall paint in the lobby: Low-VOC paint reduces off-gassing from the paint, not tracked-in dirt and pollen.

Higher-MERV filters in the air handlers: Better filters catch some airborne particles after they enter, but they do not stop dirt and moisture tracked in on shoes.

Permanent walk-off grilles at entries: Correct. Permanent entryway systems such as grates or grilles at regularly used entrances capture particulates and moisture at the door, keeping them out of the occupied spaces, a source-control IAQ strategy.

Daily vacuuming of the reading rooms: Cleaning removes dirt after it has spread through the building; entryway systems stop it at the source.

Stop contaminants at the door with permanent entryway systems.

Test yourself under exam conditions

Take the free LEED GA test and get a score report by domain.

The full LEED GA question bank is coming. Get an email when it launches.