A reduced-pressure principle backflow prevention assembly on a boiler makeup line must be tested
Show answer & explanation
Answer: A
At installation, after repair or relocation, annually: Correct. 2021 IPC Section 312.10.2: RPZ, double check, pressure vacuum breaker and similar testable assemblies are tested at installation, immediately after repairs or relocation, and at least annually, using a listed procedure such as ASSE 5013.
Only once, when installed, by a certified tester: Partial: the initial test is required, but so are tests after repair or relocation and at least annually.
Once a year, starting one year after it is installed: Misses the required test at the time of installation.
Every five years, and again after any repair or relocation: Wrong interval; testable assemblies are tested at least annually.
Testable backflow assemblies (RPZ, DC, PVB, SVB and detector assemblies) are tested at installation, after repair or relocation, and at least annually (2021 IPC Section 312.10.2).