General Requirements

Question 1

Using the table, what is the total design occupant load of the tenant space?

Restaurant tenant space: areas and occupant load factors
SpaceFunctionArea (sq ft)Occupant load factor
Dining roomAssembly, unconcentrated (tables and chairs)3,000 net15 net
KitchenKitchens, commercial1,000 gross200 gross
Storage roomStorage600 gross300 gross
Use the factors shown (from IBC Table 1004.5).
Show answer & explanation

Answer: B

  1. 1. Dining: 3,000 sq ft net ÷ 15 net = 200 occupants.
  2. 2. Kitchen: 1,000 sq ft gross ÷ 200 gross = 5 occupants.
  3. 3. Storage: 600 sq ft gross ÷ 300 gross = 2 occupants.
  4. 4. Total = 200 + 5 + 2 = 207 occupants.

205: Omission: the storage room (600 ÷ 300 = 2) was left out.

207: Correct. 3,000 ÷ 15 = 200; 1,000 ÷ 200 = 5; 600 ÷ 300 = 2; total 207.

267: Wrong factor: applies the 15 net dining factor to the kitchen as well (4,000 ÷ 15 ≈ 267) and drops storage.

307: Wrong factor: applies the 15 net factor to all 4,600 sq ft instead of each function's own factor.

Occupant load = floor area ÷ the load factor for each function of space; compute each area with its own factor (net or gross as listed), then add.

Question 2

Based on the submittal log, which item may the general contractor release to its supplier for ordering now?

Submittal log (excerpt), returned by the architect
Submittal no.DescriptionSubmittedReturnedArchitect action
03 30 00-01Concrete mix designsMar 3Mar 14Revise and resubmit
05 12 00-01Structural steel shop drawingsMar 5Mar 19Rejected
08 11 13-01Hollow metal framesMar 10—Under review
09 29 00-01Gypsum board product dataMar 11Mar 20Approved as noted
Specifications require an approved submittal before ordering or fabrication.
Show answer & explanation

Answer: D

03 30 00-01, concrete mix designs: "Revise and resubmit" means the submittal must be corrected and reviewed again before the work proceeds.

05 12 00-01, structural steel shop drawings: "Rejected" means the submittal does not meet the contract documents; a new submittal is required.

08 11 13-01, hollow metal frames: Still under review: nothing may be ordered until the architect returns an approving action.

09 29 00-01, gypsum board product data: Correct. "Approved as noted" allows ordering or fabrication, provided the architect's noted corrections are incorporated.

Track submittal actions in the log: "Approved" and "Approved as noted" release the work (incorporating notes); "Revise and resubmit," "Rejected" and pending items do not.

Question 3

A guardrail system is built with its top rail 42 in above the deck. When a 200-lb test load is applied downward at the top rail, the top edge deflects to 38 in above the deck and does not break. Which conclusion is correct under 29 CFR 1926.502(b)?

Show answer & explanation

Answer: B

It complies, because the rail held 200 lb without failure: Incomplete test: strength alone is not enough; the rule also limits how far the top edge may deflect under the 200-lb load.

It does not comply, because the top edge dropped below 39 in: Correct. 1926.502(b)(4): under the 200-lb downward test load, the top edge may not deflect to less than 39 in above the walking/working level.

It complies, because top rails need to resist only 150 lb: Wrong row: 150 lb is the midrail/screen requirement in 1926.502(b)(5); the top rail must withstand 200 lb.

It does not comply, because no deflection is permitted: Overstated: some deflection is allowed as long as the top edge stays at 39 in or higher.

Guardrail checks under 1926.502(b): top edge 42 in ± 3 in; top rail withstands 200 lb outward or downward without deflecting below 39 in; midrails withstand 150 lb.

Site Construction

Question 4

A building pad needs 1,200 compacted cubic yards of fill. For the borrow soil, compacted volume is 80% of bank volume, and loose volume is 125% of bank volume. How many bank cubic yards must be excavated from the borrow pit?

Show answer & explanation

Answer: C

  1. 1. Compacted volume = 0.80 × bank volume (given).
  2. 2. Bank volume = 1,200 ÷ (1 − 0.20) = 1,200 ÷ 0.80 = 1,500 BCY.
  3. 3. The swell factor applies only to hauling (1,500 × 1.25 = 1,875 LCY); it is not needed here.

960 BCY: Multiplies by 0.80, which gives less soil than the compacted volume needed.

1,440 BCY: Multiplies by 1.20 (the common shrink shortcut). Compacted is 80% of bank, so divide by 0.80 instead.

1,500 BCY: Correct. Compacted = 0.80 × bank, so bank = 1,200 ÷ 0.80 = 1,500 BCY.

1,875 BCY: This is the loose volume to haul (1,500 × 1.25), not the bank volume to excavate.

Keep the three soil states apart: bank (in place), loose (swell, for hauling) and compacted (shrink, for fill). Convert to bank first.

Question 5

A soils test shows an unfissured clay with an unconfined compressive strength of 1.8 tsf. The trench runs beside a highway with constant heavy-truck traffic. Under Subpart P Appendix A, how must the soil be classified?

Show answer & explanation

Answer: B

Type A: The strength meets Type A (1.5 tsf or more), but soil subject to vibration from heavy traffic can never be Type A.

Type B: Correct. Soil that meets the Type A strength but is fissured or subject to vibration is classified as Type B (Appendix A, (b)).

Type C: Type C is for soil of 0.5 tsf or less, submerged or seeping soil, or granular soil. None of these applies here.

Stable rock: Clay is soil, not natural solid mineral matter, however high its strength.

Type A needs 1.5 tsf or more and none of the exclusions (fissured, vibration, previously disturbed, layered sloping into the cut, seeping). Excluded soil that still has the Type A strength drops to Type B.

Question 6

Refer to Sheet S-1. Using Note 2, how many bank cubic yards of soil must be excavated for the continuous footing trench?

Sheet S-1: Foundation plan and footing section
FOUNDATION PLANCONTINUOUS FOOTINGAND 8" WALL - SEE 166'-0" OUT-TO-OUT OF FOOTING46'-0"NNORTH1STORM DRAIN TRENCH (SOUTH) - SEE NOTE 3SECTION 1FINISH GRADE8" CONC. WALL#5 DOWELS @ 16" O.C.BACKFILLBACKFILL4'-0"24"12"(3) #5 CONT. BOTTOMUNDISTURBED SOILNOTES:1. Footing bottom cast against undisturbed earth; wall faces formed, then backfilled.2. Footing trench: vertical sides, 3'-0" wide x 4'-0" deep, centered on the footing.3. Storm drain trench: 7'-0" deep, 3'-0" bottom width, Type B soil, both sides sloped.4. Existing grade = finish grade. Footing is continuous, 24" wide x 12" deep.
Original practice drawing. Plan dimensions are out-to-out of the 24-in. footing; the 8-in. wall is centered on the footing. Figure not drawn to scale.
Show answer & explanation

Answer: B

  1. 1. Out-to-out perimeter = 2 × (66 + 46) = 224 ft.
  2. 2. Centerline perimeter = 224 − 4 × 2 ft footing width = 216 ft.
  3. 3. Trench volume = 216 ft × 3 ft × 4 ft = 2,592 cu ft.
  4. 4. 2,592 ÷ 27 = 96.0 bank cu yd.

92.4 cu yd: Uses the inside footing perimeter (208 ft), which drops the trench length at the corners.

96.0 cu yd: Correct. The trench is centered on the footing, so its length is the footing centerline perimeter, 216 ft: 216 × 3 × 4 = 2,592 cu ft ÷ 27 = 96.0 bank cu yd.

99.6 cu yd: Uses the out-to-out perimeter (224 ft), which double-counts the corners.

120.0 cu yd: Adds 25% swell; the question asks for bank (in-place) volume, not loose volume.

For a rectangular perimeter footing or trench, take quantities along the centerline: out-to-out perimeter minus 4 × the width. Divide cubic feet by 27 for cubic yards.

Masonry

Question 7

Refer to Sheet A-201. The south wall is built of nominal 8 × 8 × 16 in CMU at 1.125 units per sq ft of wall face, lintel and bond-beam units included. Ignoring waste, how many CMU are required for this wall, net of all openings?

Sheet A-201: South elevation and typical wall section
SOUTH ELEVATIONWALL SECTIOND1W1W1Bond beam (top course)40'-0"12'-0"D1 = door 4'-0" W x 8'-0" H (1 req'd). W1 = window 4'-0" W x 4'-0" H (2 req'd).Walls: 8" CMU. Lintels: 8" U-block, grout solid, 2-#5, 8" min. bearing each end.Bond beam at top course: 8" U-block, grout solid, 2-#5 continuous.Roof joists: K-series @ 6'-0" o.c., 2 rows horizontal bridging, ends welded to bearing plates.Roof: 40'-0" x 60'-0" in plan, slope 1/4" per ft to drains.Single-ply membraneCover boardPolyiso, 2 layersSteel roof deckBond beam, 2-#5Bearing plate8" CMUGradeFootingK-series joistSlab
Single-story CMU building with a steel-joist roof. Figure not drawn to scale.
Show answer & explanation

Answer: A

  1. 1. Gross wall face: 40 ft × 12 ft = 480 sq ft.
  2. 2. Openings: D1 4 ft × 8 ft = 32 sq ft; W1 2 × (4 ft × 4 ft) = 32 sq ft; total 64 sq ft.
  3. 3. Net wall: 480 − 64 = 416 sq ft.
  4. 4. Units: 416 sq ft × 1.125 CMU per sq ft = 468 CMU.

468: Correct. Gross 480 sq ft less 64 sq ft of openings (one D1 at 32 sq ft and two W1 at 16 sq ft each) leaves 416 sq ft; 416 × 1.125 = 468 units.

486: Deducts the door and only one of the two W1 windows (432 sq ft × 1.125); the window tag calls for 2 required.

504: Deducts the door only (448 sq ft × 1.125) and forgets both windows.

540: Gross wall area × 1.125 with no deduction for openings.

For 8 × 16 face CMU, use 1.125 units per sq ft of net wall area: take gross area, deduct every opening shown in the opening tags, then multiply (Modern Masonry, estimating block).

Wood

Question 8

The truss design drawings call for continuous lateral restraint (CLR) on one web of each truss. The framer nails a continuous 2 × 4 to that web across 14 trusses in a row and adds nothing else. What is the most likely problem?

Show answer & explanation

Answer: C

None; a continuous CLR line alone stabilizes the webs: CLR only ties the webs together; without anchorage they can still move sideways as a group.

The CLR belongs on the bottom chord, not the web: The truss design drawing places the CLR on the web it calls out; moving it defeats its purpose.

Without diagonal bracing, the webs can buckle together: Correct. CLR must be anchored with diagonal bracing (or another restraint) so the accumulated forces go into the structure; otherwise all the restrained webs can buckle as a unit.

CLR is temporary and comes out before sheathing: Web CLR shown on the truss design drawing is permanent member restraint, not temporary bracing.

Permanent web restraint = CLR plus diagonal bracing (or T-, L- or scab reinforcement) per the truss design drawing and BCSI-B3.

Question 9

A carpenter lays out wall plates for 1-1/2-in studs at 16 in on center so that the edges of 48-in sheathing panels land on stud centers. Measured from the end of the plate, where should the first layout line (the near edge of the first intermediate stud) be marked?

Show answer & explanation

Answer: A

  1. 1. Panel edges must fall at 16, 32, 48 in on stud centers.
  2. 2. Half a stud: 1-1/2 in ÷ 2 = 3/4 in.
  3. 3. First layout line (near edge): 16 − 3/4 = 15-1/4 in; then every 16 in.

15-1/4 in: Correct. The stud center must fall at 16 in, so its near edge is 16 − 3/4 = 15-1/4 in; the stud is set on the far side of the line.

16 in: Marks the stud center as if it were the edge; the stud then centers at 16-3/4 in.

16-3/4 in: Places the stud center 3/4 in past the 16-in mark, so panel edges miss the stud centers.

17-1/2 in: Adds a full stud width to 16 in, putting the stud on the wrong side of the mark.

For 16-in o.c. layout, mark the first stud edge at 15-1/4 in (12-in o.c.: 11-1/4; 24-in o.c.: 23-1/4) so sheathing joints break on stud centers.

Doors, Windows, and Glazing

Question 10

A swinging door on an accessible route has a frame opening of 34 in, measured jamb face to jamb face. With the door open 90°, the 1¾-in-thick leaf projects into the opening at the hinge jamb, and the latch-side stop projects ⅝ in. Under ICC A117.1-2017, what is the clear width, and does it comply?

Show answer & explanation

Answer: A

  1. A117.1 clear width of a swinging door = distance from the face of the door (open 90°) to the latch-side stop.
  2. Start with the frame opening: 34 in.
  3. Subtract the leaf thickness: 34 − 1.75 = 32.25 in.
  4. Subtract the stop projection: 32.25 − 0.625 = 31.625 in = 31⅝ in.
  5. Compare with the 32-in minimum: 31⅝ in < 32 in, so the door does not comply.

31⅝ in; does not comply: Correct. Clear width is measured from the face of the door, open 90°, to the stop: 34 − 1¾ − ⅝ = 31⅝ in. That is less than the 32-in minimum, so the door does not comply.

32¼ in; complies: Subtracts the door thickness but forgets the ⅝-in stop. Clear width is measured to the stop, not to the jamb face.

33⅜ in; complies: Subtracts the stop but forgets that the open leaf's own thickness narrows the opening.

34 in; complies: Uses the frame dimension. A117.1 measures between the open door face and the opposite stop.

A117.1-2017 Section 404.2.3: at least 32 in clear, measured with the door open 90° from the door face to the stop. A nominal 34-in (2'-10") door does not give 32 in clear; a 36-in leaf is the usual choice.

Question 11

A storefront wall has four glazed panels, and no walking surface is nearby other than the floor in front of each. Under IBC Section 2406, which panel is in a hazardous location and must have safety glazing?

Show answer & explanation

Answer: D

A glazed transom directly over the entry door, bottom edge 84 in above the floor: Not hazardous under the adjacent-door rule, which applies only when the bottom edge is less than 60 in above the floor. With a bottom edge 84 in up, the window rule (bottom edge under 18 in) is not met either.

A 2 ft × 2 ft fixed window 10 ft from any door, bottom edge 15 in above the floor: Not hazardous: the window rule needs every one of its conditions, including a pane larger than 9 sq ft. A 4 sq ft pane fails that condition.

A 4 ft × 5 ft fixed window 30 in from the door edge, bottom edge 24 in above the floor: Not hazardous: it lies outside the 24-in arc from the door edge, and its bottom edge is above 18 in, so the window rule does not apply.

A fixed sidelite in the same wall, 12 in from the closed door's edge, bottom edge 20 in above the floor: Correct. Glazing within a 24-in arc of either vertical edge of a closed door, with its bottom edge less than 60 in above the walking surface, is a hazardous location (IBC 2406.4).

IBC Section 2406.4 lists the hazardous locations. For glazing next to doors, check two things: is it within 24 in of the door edge, and is its bottom edge below 60 in? For other windows, all four conditions must be met: more than 9 sq ft, bottom edge under 18 in, top edge over 36 in, and a walking surface within 36 in.

Procurement and Contracting Requirements

Question 12

A nonexempt hourly finisher paid $30 per hour works 10 hours each day Monday through Thursday and 6 hours on Friday in one workweek. No state or union rule applies. Under the federal Fair Labor Standards Act, what are the worker's gross wages for the week?

Show answer & explanation

Answer: B

  1. 1. Hours worked = 4 × 10 + 6 = 46 hours.
  2. 2. Straight time = 40 h × $30 = $1,200.
  3. 3. Overtime = 6 h × (1.5 × $30 = $45) = $270.
  4. 4. Gross wages = $1,200 + $270 = $1,470.

$1,380: Pays all 46 hours at the straight-time rate, with no overtime premium.

$1,470: Correct. 46 hours: 40 × $30 = $1,200 plus 6 overtime hours × $45 (1.5 × $30) = $270; total $1,470 — Fair Labor Standards Act, 29 U.S.C. 207; NASCLA Contractors Guide (Basic 14th): employment law.

$1,500: Pays overtime for hours over 8 in a day (8 hours); the FLSA requires overtime only for hours over 40 in the workweek.

$2,070: Pays every hour at time-and-a-half; only hours over 40 earn the premium.

FLSA overtime = 1.5 × the regular rate for hours worked over 40 in a workweek; federal law has no daily overtime rule.

Question 13

A contractor's estimated cost on a bid is $360,000. Company policy requires a gross margin of 20% of the selling price. What markup on cost must the estimator apply?

Show answer & explanation

Answer: C

  1. 1. Margin is figured on selling price: price = cost ÷ (1 − 0.20) = $360,000 ÷ 0.80 = $450,000.
  2. 2. Markup amount = $450,000 − $360,000 = $90,000.
  3. 3. Markup on cost = $90,000 ÷ $360,000 = 25%.

16.7%: Converts a 20% markup into a margin (0.20 ÷ 1.20), which is the reverse conversion.

20.0%: Uses the margin as the markup: $360,000 × 1.20 = $432,000, which yields only a 16.7% margin.

25.0%: Correct. Markup = margin ÷ (1 − margin) = 0.20 ÷ 0.80 = 25%; $360,000 × 1.25 = $450,000, and $90,000 ÷ $450,000 = 20% — NASCLA Contractors Guide (Basic 14th): markup vs margin.

125.0%: This is the selling-price multiplier (1 ÷ 0.80 = 1.25) written as a percentage, not the markup.

Markup is a percentage of cost; margin is a percentage of selling price. Markup = margin ÷ (1 − margin); price = cost ÷ (1 − margin).

Question 14

Based on the activity list, which path is the critical path?

Activity list — tenant build-out (durations in working days)
ActivityDescriptionDuration (days)Immediate predecessor(s)
AMobilize and layout3—
BDemolition5A
COrder long-lead HVAC units4A
DFraming6B
EOverhead MEP rough-in3B, C
FHVAC unit delivery7C
GInspections and close-in4D, E
HSet HVAC units2F
IFinishes and punch list3G, H
All relationships are finish-to-start with no lag. The project starts at the beginning of day 1 (early start of A = 0).
Show answer & explanation

Answer: A

  1. 1. List every path from start to finish: A-B-D-G-I, A-B-E-G-I, A-C-E-G-I, A-C-F-H-I.
  2. 2. Sum durations: 21, 18, 17 and 19 days.
  3. 3. The longest path (21 days) is critical: A-B-D-G-I.

A-B-D-G-I: Correct. Path lengths: A-B-D-G-I = 3+5+6+4+3 = 21 days, the longest path, so every activity on it has zero total float (Gould & Joyce, Construction Project Management: CPM).

A-B-E-G-I: This path totals 3+5+3+4+3 = 18 days; it is shorter than A-B-D-G-I.

A-C-E-G-I: This path totals 3+4+3+4+3 = 17 days, the shortest path.

A-C-F-H-I: This path totals 3+4+7+2+3 = 19 days; it holds the longest single activity (F) but is not the longest path.

The critical path is the longest path through the network; it sets the project duration and its activities have zero total float.

Question 15

An estimate shows direct costs of $182,000 materials, $146,000 labor and $52,000 equipment. Company policy adds overhead at 10% of direct cost, then adds profit at 8% of total cost (direct cost plus overhead). What is the bid price?

Show answer & explanation

Answer: B

  1. 1. Direct cost = $182,000 + $146,000 + $52,000 = $380,000.
  2. 2. Overhead = 10% × $380,000 = $38,000; total cost = $418,000.
  3. 3. Profit = 8% × $418,000 = $33,440.
  4. 4. Bid = $418,000 + $33,440 = $451,440.

$448,400: Applied 10% and 8% both to direct cost only (18% of $380,000); profit must be taken on direct cost plus overhead.

$451,440: Correct. Direct cost $380,000 + overhead $38,000 = $418,000; profit 8% × $418,000 = $33,440; bid = $451,440 (NASCLA Contractors Guide, Basic 14th: markup is applied to cost).

$454,348: Treated the 8% as a margin on selling price ($418,000 ÷ 0.92) instead of a markup on cost.

$463,415: Treated the combined 18% as a margin on selling price ($380,000 ÷ 0.82).

Build the bid in the order the policy states: direct cost, then overhead, then profit on the running cost. A markup is on cost; a margin is on price.