NASCLA Practice Test 11

10 free NASCLA practice questions in the real exam format, covering the official content areas, with an explanation for every answer.

NASCLA Practice Test 11Tutor mode

Question 1 of 10

Site Construction
Sheet S-1: Foundation plan and footing section
FOUNDATION PLANCONTINUOUS FOOTINGAND 8" WALL - SEE 166'-0" OUT-TO-OUT OF FOOTING46'-0"NNORTH1STORM DRAIN TRENCH (SOUTH) - SEE NOTE 3SECTION 1FINISH GRADE8" CONC. WALL#5 DOWELS @ 16" O.C.BACKFILLBACKFILL4'-0"24"12"(3) #5 CONT. BOTTOMUNDISTURBED SOILNOTES:1. Footing bottom cast against undisturbed earth; wall faces formed, then backfilled.2. Footing trench: vertical sides, 3'-0" wide x 4'-0" deep, centered on the footing.3. Storm drain trench: 7'-0" deep, 3'-0" bottom width, Type B soil, both sides sloped.4. Existing grade = finish grade. Footing is continuous, 24" wide x 12" deep.
Original practice drawing. Plan dimensions are out-to-out of the 24-in. footing; the 8-in. wall is centered on the footing. Figure not drawn to scale.

Refer to Sheet S-1. Using Note 2, how many bank cubic yards of soil must be excavated for the continuous footing trench?